fix(ci): Update Qt version to latest
Upstream pin check / quickshell-pin (push) Successful in 46s
Tests / tests (push) Failing after 2m54s

This commit is contained in:
alvinlollo
2026-10-08 18:19:34 +11:00
parent db83549996
commit 1e8a1e3282
144 changed files with 15764 additions and 25 deletions
+26
View File
@@ -0,0 +1,26 @@
name: Upstream pin check
on:
schedule:
- cron: "0 6 * * 1" # Mondays 06:00 UTC — catches upstream/Qt drift between ISO builds
workflow_dispatch:
push:
paths:
- "localrepo/end4-pkgbuilds/quickshell-git/PKGBUILD"
- "localrepo/check-quickshell-pin.sh"
- "airootfs/root/customize_airootfs.sh"
- ".gitea/workflows/pin-check.yaml"
jobs:
quickshell-pin:
runs-on: archlinux
steps:
- name: Checkout repo
uses: actions/checkout@v4
# Tripwire for the failure mode that broke ISO build run 137:
# a quickshell pin (ours or end-4's) that predates a Qt compat fix
# or has simply gone stale. Fails the job so the drift is visible
# in Actions instead of surfacing as a 3-hour ISO build failure.
- name: Check quickshell pins
run: ./localrepo/check-quickshell-pin.sh